Jacked-in (or jacked) piles have become a staple in Singapore’s urban construction landscape, favored for their low noise and vibration compared to traditional driven piles. However, the efficiency of this method depends heavily on following rigorous installation standards.
The jacking rig must be leveled accurately using built-in hydraulic jacks. The first pile segment is pitched into the grip mechanism. Engineers must check the verticality of the pile in two orthogonal directions using plumb bobs or digital spirit levels. The structural verticality tolerance must be strictly maintained within 1 in 100. 2. Penetration and Splicing Jacked-in (or jacked) piles have become a staple
The market utilizes highly specialized hydraulic machinery featuring jacking capacities of . To prevent mechanical failures and ensure smooth installation, GeoSS dictates strict limits on machinery load deployment: The first pile segment is pitched into the grip mechanism
| Defect | Likely Cause | GEOSS Recommended Action | | :--- | :--- | :--- | | Sudden drop in jacking force (≥20%) | Pile fracture or soft pocket | Stop, extract if possible, install replacement pile. | | Refusal above design depth (≥1 m) | Boulder / old timber pile | Use pre-boring (300 mm dia.) to 500 mm below refusal depth, then re-jack. | | Excessive heave (>25 mm) | Rapid jacking in clay | Restrike all piles within heave zone after 7 days. | | Verticality drift > 1:100 | Inclined bedrock or poor jig | Install raking micro-piles as supplement. | extract if possible
Should we focus on a specific soil type like the or Old Alluvium ?
For jacked piles, pre-construction geophysical surveys can identify obstructions that might otherwise cause pile refusal or damage.