: Two specific support connectors must be plugged in; without these, the bathtub remains unstable during use

| Task | Why It Matters | |------|----------------| | Clear the space | Remove any furniture, rugs, or obstacles to give yourself room to work. | | Protect the floor | Lay down drop cloths or a protective blanket to prevent scratches and catch spills. | | Check the subfloor | Ensure the floor is level, dry, and sturdy enough to support the tub when filled. | | Turn off water supply | Locate the shut‑off valves for the bathroom and close them. |

: Add your water, ensuring it does not exceed the recommended fill line (usually about 70-80% full) to avoid overflow when you step in. Key Features of Portable Tubs Space Saving

Attach the flexible drainage hose to the tub outlet and secure it with a pipe clamp if necessary. ashhbritt101 bathtub 22l install

Galvanized drywall screws or roofing nails (for nailing flanges) Step-by-Step Installation Process

: Fasten a 2x4 wooden cleat horizontally along the studs just below your mark to support the back rim of the tub.

: Once the tub is seated, tighten all drain connections through the side access panel before re-installing the panel cover. Essential Tools & Parts : Two specific support connectors must be plugged

Step 1: Pre-Installation Site Assessment & Subfloor Preparation

Because this is a portable/collapsible unit rather than a permanent fixture, "installation" focuses on assembly and proper placement to ensure stability and drainage.

If you are planning your setup, I can help you tailor the installation exactly to your space: | | Turn off water supply | Locate

The drain assembly is critical to prevent leaks. Follow this sequence:

Confirm that your existing drain and overflow assembly lines up with the specifications of the 22L model. If you are transitioning from a standard tub, you may need to offset or extend your rough-in plumbing. Required Tools and Materials

: Wipe down the gaps between the tub, walls, and floor with rubbing alcohol.

If you are performing a full new installation or replacement, ensure you have the following pieces ready: : A drain kit, P-trap, and tailpiece.

to the tub before setting it in place. Use plumber's putty for the drain flange. Mortar Bed (Optional but Recommended)