Run a ( Lines / Reports / Thermal Clearance Analysis ) to ensure wires do not violate ground clearance at maximum operating temperatures.
Every project begins with a Criteria file ( .cri ). This file contains the "rules of the game," including:
The modern standard. You can import large .las or .laz datasets. Use the software’s filtering tools to classify points into ground, vegetation, and existing structures.
Represent the poles or towers. These are either built simply within PLS-CADD (Method 1/2 structures) or linked from PLS-POLE/TOWER (Method 4 structures). Step 4: Structure Spotting and Stringing pls-cadd tutorial pdf
Structures can be modeled using simplified method 1 or 2 (stick figures with allowable wind/weight spans), or method 4 (fully non-linear finite element models linked to PLS-POLE or TOWER).
represents individual horizontal span lengths. For severe terrain changes or extreme tension unbalances, you can uncouple spans and use the option under the Sections menu. 7. Clearance and Engineering Analysis
For long corridors, use Structures > Automatic Spotting . The software optimizes structure locations and heights based on your minimum ground clearance constraints, maximizing span lengths while minimizing total project cost. 6. Conductor Sagging and Tensioning Run a ( Lines / Reports / Thermal
Verify if any pole or tower is overloaded (exceeding 100% capacity) under extreme weather loads.
While Power Line Systems (PLS) provides extensive online/electronic manuals directly within the software, several specialized documents are available through educational and community platforms:
Whether you are using (allowable spans) or Method 4 (integrated PLS-POLE/TOWER structures)? You can import large
Provides construction crews with exact GPS coordinates, structure types, line angles, and span lengths.
Context-sensitive help is highly developed in PLS. Clicking any menu item and pressing F1 instantly opens the exact page of the user manual explaining that feature.